Application for a new or replacement water connection

In order for us to provide you with a quote, we'll need:

  • Site location plan, clearly showing the location of the site in relation to the nearest public highway (or with a grid ref) and the surrounding geography and the scale of the plan.
  • Relevant design fee
  • Soils report (only required if the site is contaminated)
  • Flow rate in litres per second (only required if greater than the standard 25mm connection)
  • Copy of permission agreement to lay the service within third party land if applicable.

Application for proposed development main and services

In order for us to provide you with an estimate, we'll need:

  • Site location plans
  • Number of plots

In order for us to provide you with a firm quote, we'll need:

  • DWG electronic Plan
  • Soils report
  • Build programme
  • Estimate fee
Launch Recite Me web accessibility software
^

Return to top